transport bosses have been fired. Who is to blame for ordering the wrong size trains?After granting the manufacturing contract to CAF, Renfe says it provided measurements based on infrastructure specifications provided by Adif. France made a similar error in 2014SNCF ordered 2,000 regional trains that were too wide for the network’s platforms